รายละเอียดสินค้า
119 hp - 200 PSIG - Ultra Low NOx Nationwide Boiler’s ultra low NOx, 119 hp (4,106 lbs/hr) Superior skid-mounted boiler system is designed at 200 psig pressure, firing natural gas. It is fully piped and wired and includes the following components.
- 119 hp Superior Apache Package Firetube Boiler.
- PowerFlame NP2 Ultra Low NOx Burner.
- 2" Maxitrol 210D Gas Pressure Regulator (mounted).
- NEMA 4 Control Panel w/ Siemens LMV Parallel Positioning Controls.
- Valve Trim (safeties, drain, etc.)
- Blowdown Valves (mounted & pre-piped)
- Duplex Feedwater System w/ Condensate Return Tank & Preheater (mounted & pre-piped)
- ASME Blowdown Separator with Aftercooler Package (mounted & pre-piped)
- Non-return Valve & 2nd Steam Gate Valve (loose)
- Single Point 480V Electrical Disconnect Connection w/ Step Down 115V Transformer.
- 6" x 2 1/2" ASME Reducer Spool (loose)
- Stub Stack (loose)
- Meets ASME Section I, Cal Code & CSD-1 Requirements.
- Weatherproofed (except for freezing conditions)
- Operating Manuals on CD's.
Fuel Consumption
Natural Gas |
4,998 SCFH @ 2-10 psig. |
Connection Sizes
Steam |
2 ½"-300# FLG |
Natural Gas |
2" NPT |
Blowdown / Drain |
4"-300# NPT |
Condensate Return |
2 ½" NPT |
Make-up Water |
¾" NPT |
Feedwate |
1 ¼" NPT |
Stack |
16.5" |
Electrical Power Service Requirements
480 VAC, 3 ph, 60 hz, 35 AMPS |
Dimensions & Weights
Length |
16' 3" |
Width |
8' 4" |
Height |
8' 8" |
Shipping Weight |
14,000 lbs |
Operating Weight |
22,000 lbs |
Emissions Data (natural gas)
NOx (corr. to 3% O2) |
9 ppm |
CO (corr. to 3% O2) |
50 ppm |